ZEKO Solution
About ZEKO Food Machinery & Factory Capability
ZEKO Food Machinery is the export brand of Shandong ZEKO Intelligent Equipment Co., Ltd. The company supplies food extrusion production lines, twin-screw extruders, industrial microwave systems and hot-air drying equipment for overseas food and feed manufacturers.

Company and factory identity
Legal company name: Shandong ZEKO Intelligent Equipment Co., Ltd.
Factory address: No. B8, ProLogis Intelligent Equipment Industrial Park, Qihe County, Dezhou City, Shandong Province, China.
Overseas buyers can use this legal identity and address when reviewing a quotation, arranging a factory visit or verifying the machinery supplier responsible for a project.
What ZEKO manufactures and supplies
ZEKO focuses on machinery for food extrusion, drying and sterilization projects. Core equipment and production-line categories include:
- Puffed snack production lines for corn puffs, cereal snacks, rice snacks, cheese balls and filled products
- Pet food extrusion lines for dry dog food and cat food
- Floating and sinking fish feed lines
- Twin-screw food extruders supplied as a single machine or line component
- Industrial microwave drying and sterilization systems
- Industrial hot-air and steam drying equipment
In-house machinery preparation

Workshop work covers machine preparation, production-line assembly, conveying equipment, drying sections, seasoning systems and electrical cabinets according to the confirmed project. The equipment scope is selected around the buyer’s finished product, raw material, required capacity and factory conditions.
Food-contact parts can be specified in 201 or 304 stainless steel according to the confirmed machine specification. Voltage, equipment layout, molds, capacity and seasoning arrangements can also be customized.
Assembly and testing before shipment

Machines are assembled and checked before packing. For a complete extrusion project, the factory preparation may include the mixer, conveyor, extruder, air conveyor, oven or dryer, seasoning equipment, finished-product conveyor and packaging support.
Testing and project review help confirm the mechanical operation, electrical cabinet configuration and connection between line sections. Buyers can request relevant workshop photos or videos during project preparation.
Project information required from buyers
Before preparing a production-line proposal, ZEKO normally needs:
- Finished product and reference photos
- Raw material or available formula information
- Required output in kilograms per hour
- Local voltage and electrical frequency
- Workshop length, width and ceiling height
- Available electricity, natural gas or steam for drying
- Seasoning, automation and packaging requirements
This information allows the extruder, dryer and downstream equipment to be sized as one complete process rather than as unrelated machines.
Production time, packing and delivery

Reference production time is approximately 25-30 days after the initial payment for a complete line and 15-20 days for a single machine. Actual timing depends on the confirmed configuration and customization scope.
Export preparation may include machine packing, container-loading coordination, spare parts preparation and shipment documentation support. Installation and training arrangements are confirmed according to the destination and project scope.
Start a better-defined project brief
Share the final product, raw material, target capacity, factory voltage and approximate workshop dimensions. ZEKO will use these inputs to discuss the process route and the equipment scope that should be confirmed before quotation.
